GUIDO FUSI
COMMISSIONING MANAGER, ECC Solutions GmbH
The main activity is a follow-up of engineering with many different company as: Sicon Oil&Gas, GE Nuovo Pignone, Sadelmi, Carlo Gavazzi Impianti.
The activity it's close to the PLC (Siemens S7, GE Fanuc 90-30 90-70, Rockwell 5000), DCS-HMI (WinCC, Cimplicity), E&D (HIMA HILOP II), F&G (HIMA HILOP II), BMS (Burners Management System), BPS (Burner Protection System), Vibration Monitoring System (Bently Nevada 3500- Bruel&Kjaer Vibro), Speed Controller (Woodward 505e), Field Instruments (PT-FT-LT-TT-Ph-Cl-Rx-Co-O2-Nox-SO2-SO, ect), beside the Purchase Technical Specification, Technical Evaluation, Data-Sheet, Electrical one line diagram and Power Distribution, System Integrator, ect.
2009 - 2011Bandirma Turkey site, on CCPP (Combined Cycle Power Plant) with 2
Mitsubishi Gas Turbine and 1 Steam Turbine 2 Boiler (Nooter Erikson US) 1 for DEMO Gas Turbine, arrived @ site during the
erection and commissioning DEMO, on duty as IE&C Specialist follow the Commissioning Documents Certifications DEMO during the test Pre-Commissioning & Commissioning, Follow the field activity (DCS-PLC-ESD-F&G), Coordinate the Calibration and Loop Check of field Instruments, Meeting with Commissioning Manager to verify the planning and schedule activity
My duty as to be in charge for Project Manager and following the I&C and Electrical supervisor, produce all documentation as Oneline Electrical distribution, Technical Specification Electrical Data-Sheet for motor, Hook-up dwg, etc. For I&C Logic Diagram, Cause&Effect diagram, Narrative, Instruments Data-Sheets, Complex Loop, PLC DCS HMI/SCADA Hardware configuration, Technical Evaluation, etc.
Negotiation with Material & Engineering Suppliers, updating for Documentations to be approved from Client, Reminders to
suppliers to be agree with planing, Flow Chart to locate for each discipline the PE. Ability of coordination and control of the activities of Instrumentation & Control of the project as Lead Engineer ? Issue of technical specifications / Material Requisitions for field instrumentation, systems, (DCS-PLC - ESD - F&G) ? Bid technical evaluation and tabulation ? Support to Procurement during the negotiations with the Suppliers ? Issue Material Requisitions for Purchase Order ? Coordination with other engineering disciplines ? Support to the Site during erection and commissioning phases
2007 - 2008Develop engineering of Power Station documents as; Purchase Technical Specification, Technical Evaluation, Data-Sheets, System Integrator for BMS-BPS Systems.
In Marcallo office El-Tebbin (Egipt) Power Station 2x350MW Gas/Oil fired Units, cover the position of Lead I&C Project, developed the BMS-BPS SAS Logics following the engineering of systems including the field instruments (Data-Sheet, I/O List, Wiring Diagram, Cause & Effect, Technical Specification, ect) connect to the systems.
The supplier of boiler is Ansaldo Caldaie, in touch with the engineering department to develop the system in according with the Project specification and the client material requisition written from PGESCO USA engineering Company.
1998 - 2008Dear Sir
Let me introduce my self, my name is Guido Fusi I am 49 years, more than 20 years experience in Automation and Control I&C in different kind of Plant; Pipeline, Power Station, Compression Station, Petrochemical, Chemical, LNG, Steam Turbine with Multi Compressor or Generator, Water Treatment, ESD and F&G system, PLC DCS HMI SCADA systems.
Reference list: GE Nuovo Pignone, Sicon Oil&Gas, KIDDE Italia (SILVANI), SES ASA Protection,
Woodside (Australia), AGIP, Snamprogetti, Saipem, Sadelmi, Carlo Gavazzi Impianti, SIRI Donau Carbon, ABB Sadelmi, IDRECO,
Devices used;
PLC: Siemens 300-400, GE Fanuc 9030-9070, Rockwell 5000, HIMA ILOP II.
HMI SCADA: WinCC, Cimplicity,
Speed Controller: Woodward 505.
Vibration Monitor: Bently Nevada 3500.
2010 - 2010KEU John Zink GmbH (Luxembourg) 2010 August to Present EPC Company
In Saudi Arabia, Al Jubail SK (Saudi Kayan) for Commissioning and start up the Thermal Oxidizer for Spent Caustic, follow the
Dry Out of refractory done by J+G GmbH, inspection after cool down: Spent Caustic Gun, Water Gun, all transmitters; PIT, FIT,
AIT, pH, Turbidity, O2, SO, CO, CO2, follow the start up and tuning the system with 2 Units “A” & B , with the Thermal Oxidizer has been commissioned a Waste Water Treatment, reading on line the pH and Turbidity and verify the dosing pump of Coagulant and Flocculant by Turbidity analyzer, add HCL with pH meter.
Working under supervision of KBR Personnel US Company from Houston, was following the activity, meeting with client,
following the spare parts, punch list, and planning.
2008 - 2009In Linde Inpianti EPC Engineering Company specialize in Pre-Heating (Furnace) devices for many differents applications in many differents Country; Iran, Portugal, Serbia, UAE, Brazil, etc,.
My duty as to be in charge for Project Manager and following the I&C and Electrical supervisor, produce all documentation as Oneline Electrical distribution, Technical Specification Electrical Data-Sheet for motor, Hook-up dwg, etc. For I&C Logic Diagram, Cause&Effect diagram, Narrative, Instruments Data-Sheets, Complex Loop, PLC DCS HMI/SCADA Hardware configuration, Technical Evaluation, etc.
Negotiation with Material & Engineering Suppliers, updating for Documentations to be approved from Client, Reminders to
suppliers to be agree with planing, Flow Chart to locate for each discipline the PE. Ability of coordination and control of the activities of Instrumentation & Control of the project as Lead Engineer ? Issue of technical specifications / Material Requisitions for field instrumentation, systems, (DCS-PLC - ESD - F&G) ? Bid technical evaluation and tabulation ? Support to Procurement during the negotiations with the Suppliers ? Issue Material Requisitions for Purchase Order ? Coordination with other engineering disciplines ? Support to the Site during erection and commissioning phases
In charge also for the follow-up of Field troubleshooting in contact with the Field technicians to follow erection and Commissioning. In total I follow 14 Project plus 3 new Project, the 14 Project already acquired 7 of them was in erection and 5 in commissioning fase.
2006 - 2007Develop the DCS ESD Software for Upstream and Downstream to increase the production of Ship load from 35000Bl/h to 75000Bl/h.
In Milan office on El-KAFJI KJO Project in Saudi Arabia, cover the position of I&C Commissioning Manager, developed the DCS ESD Logics following the engineering of package as; Ruhr Pumpen n°4 Pump drived from 2MW electrical motor to load the ships on marine terminal that Pumps is controlled from each PLC and each Vibration Monitor 3500 Bently Nevada all in network with DCS & ESD HMI/SCADA systems, BMS BPS package supply from Enviro Kinetics USA company in Los Angeles that supply 3BMS-BPS systems to control the pre-heating of crude oil before load on those systems follow the FAT in Los Angeles.
In touch with the field activity and coordinating with the Client the planning and procedure.
Ability: Coordination and control of the activities of I&C of the project as Lead Engineer • Issue of technical specifications Material Requisitions for field instrumentation, systems, (SCADA, HMI, DCS-PLC-ESD-F&G) • Bid technical evaluation and tabulation • Support to Procurement during the negotiations with the Suppliers • Issue Material Requisitions for Purchase Order • Coordination with other engineering disciplines • Support to the Site during erection and commissioning phases
2002 - 2005Pre-commissioning, Commissioning, Start-up, Troubleshuting and Service on Steam Turbine with Compressor or Generator.
2006
Cagliari Italy to restart a Cogeneration Plant that was started and for few reason has been stopped and after 2 years was decided
to restart the plant, has been done: troubleshooting, commissioning and start-up of the Steam Turbine with 9Mw, Woodward 505
Generator verify the serial link between PLC and Bently Nevada 3500 as a Vibration Control all in network with a DCS
HMI/SCADA
2003
Daqing China on PETROCHINA Urea Plant , with the Booster Compressor SRL601 and Steam Turbine with CO2 Compressor MCL & BCL verify the serial link between PLC with HMI/SCADA Cimplicity and DCS all in network with CCC Controller for 2 Antisurge valve 1° for Booster and the 2° for a MCL BCL Compressors instruments has been commissioned successfully. Venezia Refinery of ENI S.p.A Steam Turbine for Power Generation 40MW for a troubleshooting investigate on inquisitive Emergency Shutdown, Indonesia on PERTAMINA Refinery to close a pending point after the start-up, calibration of Throttle Valve change the solenoid valves, replace the Baring temperature detector , verify the serial link between PLC and DCS all Point has been close. Malaysia MLNG Plant in Bintulu (Sarawak) with SIMOVERT S type the rugged converter for synchronous motors up to 75 MW 1.8 kV - 12 kV. Malpensa Airport for 4MW Steam Turbine Power Generation commissioning & Start up the steam has been generated from the 3 Gas Turbine Turbomach Swiss Company.
Compressor Station in BAGLAN ENERGY PARK in Port Talbot Cardiff UK, Mexico Tampico Madero PEMEX Refinery,
Bahrain on fertilizing plant with GPIC for mechanical Woodward, China with JCN and LINDE for Ammonia Plant with four Steam Turbo-Compressor to verify the consumption and the balancing of all the Steam Turbine, Kuwait with PIC for revamping of two Steam Turbo-Compressor to verify the material sent and stored in the Where House